Course Title: Install refrigerant pipe work, flow controls and accessories

Part A: Course Overview

Program: C4301 Certificate IV in Refrigeration and Air-conditioning Systems

Course Title: Install refrigerant pipe work, flow controls and accessories

Portfolio: Vocational Education

Nominal Hours: 60

Regardless of the mode of delivery, represent a guide to the relative teaching time and student effort required to successfully achieve a particular competency/module. This may include not only scheduled classes or workplace visits but also the amount of effort required to undertake, evaluate and complete all assessment requirements, including any non-classroom activities.

Course Contact: Program Manager

Course Contact Phone: +61 3 9925 4468

Course Contact Email: vocengineering@rmit.edu.au



Course Description

This unit covers the installation, in buildings and premises, of refrigerant piping/tubing, fittings, flow controlsand accessories for refrigeration and air conditioning systems. It encompasses working safely and to installation standards, routing pipe work to specified locations, connecting components and accessories and documenting installation work.

Pre-requisite Courses and Assumed Knowledge and Capabilities

UEENEEE102A Fabricate, assemble and dismantle utilities industry components

UEENEEE105A Fix and secure electrotechnology equipment

UEENEEE137A Document and apply measures to control OHS risks associated with electrotechnology work

UEENEEJ102A Prepare and connect refrigerant tubing and fittings

UEENEEJ103A Establish the basic operating conditions of vapour compression systems

UEENEEE101A Apply Occupational Health and Safety regulations, codes and practices in the workplace



National Competency Codes and Titles

National Element Code & Title:

UEENEEJ106A Install refrigerant pipe work, flow controls and accessories

Elements:

1. Prepare to install pipe work, flow controls and accessories

2. Install pipe work, flow controls and accessories

3. Completion of pipe work, flow controls and accessories installation.


Learning Outcomes

Refer to Elements


Overview of Assessment

Assessment Tasks 

Students must pass each of the following assessment tasks to demonstrate competent. 

Assessment

Task 1

Work Book

Task 2

JSA: Install refrigeration system

Task 3

Prac: (16)

Task 4

Assignment: Install report

Task 5

Theory test Installation

Task 6

Assignment: Press Enthalpy

Task 7

Theory test: Press Enthalpy

 These tasks assesses the following Course Learning Outcomes (CLOs):

Assessment Mapping Matrix 


Elements/

Performance Criteria Covered

Task 1

Task 2

Task 3

Task 4

Task 5

Task 6

Task 7

1.1

X

X

X


X

X


1.2

X

X

X


X

X


1.3

X

X

X


X

X


1.4

X

X

X


X

X


1.5

X

X

X


X

X


1.6

X

X

X


X

X


1.7

X

X

X


X

X


1.8

X

X

X


X

X


1.9

X

X

X


X

X


1.10

X

X

X


X

X


2.1

X


X

X

X

X

X

2.2

X


X

X

X

X

X

2.3

X


X

X

X

X

X

2.4

X


X

X

X

X

X

2.5

X


X

X

X

X

X

2.6

X


X

X

X

X

X

2.7

X


X

X

X

X

X

2.8

X


X

X

X

X

X

2.9

X


X

X

X

X

X

3.1

X

X

X

X



X

3.2

X

X

X

X



X

3.3

X

X

X

X



X

3.4

X

X

X

X



X

To be deemed competent you must demonstrate an understanding of all aspects required of the competency. Assessment methods have been designed to measure your achievement of each competency in a flexible manner over multiple tasks.