Course Title: PC and Operating Systems 4
Part B: Course Detail
Teaching Period:
Term2 2009
Course Code:
EEET5818L
Course Title:
PC and Operating Systems 4
School: 130T
Engineering (TAFE)
Campus:
City Campus
Program:
C6042 - Advanced Diploma of Computer Systems Engineering
Course
Contact
:
Robert Pill
Course
Contact
Phone:
+61 3 99254013
Course
Contact
Email:robert.pill@rmit.edu.au
Name and Contact Details of All Other Relevant Staff
Nominal Hours:
80
Regardless of the mode of delivery, represent a guide to the
relative teaching time and student effort required to
successfully achieve a particular competency/module. This may
include not only scheduled classes or workplace visits but also
the amount of effort required to undertake, evaluate and
complete all assessment requirements, including any
non-classroom activities.
Pre-requisites and Co-requisites
EEET5818L - PC and Operating Systems 3
Course Description
To provide a learner with industry recognised skills in designing, installing and implementing wireless local area network. The learning unit will emphasis network troubleshooting techniques. After the successful completion of the unit, the learner is expected to administrator local area network systems
National Codes, Titles, Elements and Performance Criteria
National Element Code & Title: |
UTENES008A Provide technical leadership in the workplace |
Element: |
1. Demonstrate Standards of Perfomance |
Performance Criteria: |
Work demonstrated follows OH&S policies and procedures with the work is appropriately sequenced in accordance with requirements Work demonstrated is coordinated effectively with others involved on the work site Work demonstrated meets requirements Unplanned events or conditions are responded to in accordance with established procedures
|
Element: |
2. Organise personal work priorities |
Performance Criteria: |
Personal competence is assessed against requirements to determine personal training needs Feedback on competence is used to develop personal training needs in accordance with established procedures Participation in technical programs to enhance competence are undertaken in accordance with established procedures
|
Element: |
3. Maintain personal competence |
Performance Criteria: |
Work priorities are organised in accordance with established procedures Work is managed effectively to accomplish requirements Technology is used to improve efficiency in the management of information in accordance with established procedures Personal training within the workplace is managed in accordance with established procedures
|
National Element Code & Title: |
UTENES304AA Undertake commissioning of advanced systems & apparatus (Computer systems) |
Element: |
1.Plan and prepare to undertake commissioning procedures |
Performance Criteria: |
Commissioning procedures are planned and prepared to ensure OH•&S policies and procedures are followed, the work is appropriately sequenced in accordance with requirements Appropriate personnel are consulted to ensure• the work is coordinated effectively with others involved on the work site Systems' commissioning procedures are checked against requirements• Materials necessary to complete the work are obtained in accordance with• established procedures and checked against requirements Tools, equipment• and testing devices needed to carry out the commissioning work are obtained in accordance with established procedures and checked for correct operation and safety Preparatory work is checked to ensure no unnecessary damage has• occurred and complies with requirements
|
Element: |
2. Undertake commissioning procedures of, advance systems and associated apparatus |
Performance Criteria: |
• OH&S policies and procedures are followed • Systems are checked as being isolated where necessary using specified testing procedures Unplanned events or conditions are responded to in accordance with• established procedures Systems' commissioning procedures are performed in• accordance with requirements, without damage or distortion to the surrounding environment or services Contingency measures are managed and implemented• in accordance with established procedures to ensure the system operates as intended or designed On-going checks of the quality of the work are• undertaken in accordance with established procedures
|
Element: |
3. Inspect and notify completion of work |
Performance Criteria: |
Final inspections and performance checks are undertaken to ensure that the• commissioning procedures of advanced system and associated apparatus conforms to requirements Commissioning results and work completion are notified in• accordance with established procedures
|
National Element Code & Title: |
UTENES406AA Develop complex testing & evaluation procedures (Computer systems) |
Element: |
1. Plan and prepare for the development of complex testing and evaluation procedures |
Performance Criteria: |
Identified OH•&S policies and procedures to be followed are planned and prepared, and the work sequence in accordance with requirements Appropriate personnel are consulted to ensure the programs for maintenance• are coordinated effectively with others involved on the work site Programs• to be developed for complex testing and evaluation are checked against job requirements Materials necessary to complete the work are identified and• detailed in accordance with established procedures and checked against job requirements Tools, equipment and testing devices needed to carry out the• work are identified and detailed in accordance with established procedures Preparatory work is identified to ensure compliance with requirements•
|
Element: |
2. Develop complex testing and evaluation procedures |
Performance Criteria: |
OH•&S policies and procedures are followed are detailed Normal• function of advanced systems and associated apparatus is ascertained and detailed in accordance with requirements Systems and associated apparatus• isolation and specified testing procedures are detailed where necessary Systems and associated apparatus complex testing is detailed in accordance• with requirements Response to unplanned events or conditions in accordance• with established procedures are detailed Approval to implement• contingencies in accordance with established procedures from appropriate personnel are detailed On-going checks of the quality of the work in• accordance with established procedures are detailed Final complex testing• and evaluation procedures of systems and associated apparatus conforming to requirements are detailed Notification of work completion in accordance• with established procedures is detailed
|
Element: |
3. Completion of work |
Performance Criteria: |
• Final testing and evaluation procedures are undertaken in accordance with established procedures • Complex testing and evaluation procedures completion is notified in accordance with established procedures
|
National Element Code & Title: |
UTENES504AA Diagnose & rectify faults in advanced systems & apparatus (Computer systems) |
Element: |
1. Plan and prepare for diagnosis of faults in advanced systems and associated apparatus |
Performance Criteria: |
Diagnosis of faults is planned and prepared to ensure OH&S policies and procedures are followed and the work is appropriately sequenced in accordance with requirements Appropriate personnel are consulted to ensure the work is coordinated effectively with others involved on the work site Systems and apparatus faults are checked against job requirements Materials necessary to complete the work are obtained in accordance with established procedures and checked against job requirements Tools, equipment and testing devices needed to carry out the work are obtained in accordance with established procedures and checked for correct operation and safety Preparatory work is checked to ensure no unnecessary damage has occurred and complies with requirements
|
Element: |
2. Diagnose faults in advanced systems and associated apparatus |
Performance Criteria: |
OH&S policies and procedures are followed Reported fault(s) are confirmed and the normal function of systems and associated apparatus is ascertained in accordance with requirements Systems are checked as being isolated where necessary using specified testing procedures Systems and associated apparatus faults are diagnosed in accordance with requirements, without damage or distortion to the surrounding environment or services Contingency measures are managed and implemented in accordance with established procedures to ensure the system operates as intended or designed Where applicable, appropriate personnel and resources are determined and coordinated to effect rectification of fault(s) Unplanned events or conditions are responded to in accordance with established procedures On-going checks of the quality of work are undertaken in accordance with established procedures
|
Element: |
3. Rectify faults in advanced systems and associated apparatus |
Performance Criteria: |
OH&S policies and procedures are followed. Systems and associated apparatus are isolated, where necessary, in accordance with established procedures Adjustments are made in accordance with established procedures where necessary, to return systems and associated apparatus to normal operating parameters Faulty component(s) are rectified or replaced, without damage or distortion to the surrounding environment or services Unplanned events or conditions are responded to in accordance with established procedures Approval is obtained in accordance with established procedures from appropriate personnel before any contingencies are implemented On-going checks of the quality of work are undertaken in accordance with established procedures Systems and associated apparatus are tested to ensure safety of the installation Systems and associated apparatus are returned to service in accordance with established procedures
|
Element: |
4. Provide status report(s) |
Performance Criteria: |
Arrangements are made for maintenance and/or repair(s), where necessary, with relevant authorised personnel in accordance with requirements Status report(s) are completed and notified in accordance with established procedures
|
National Element Code & Title: |
UTENES702AA Design electrical/electronic apparatus & systems (Computer systems) |
Element: |
1. Establish design brief |
Performance Criteria: |
• OH&S requirements and environmental issues that may influence the design are determined • Design concept and details are discussed with appropriate personnel in order to establish a detailed design brief • Design parameters are established from organisational policies and specifications for electrical systems and other requirements that may influence the design
|
Element: |
2. Design system and installation |
Performance Criteria: |
• Alternative designs are considered and discussed with appropriate personnel • Circuit/system modelling is used in common stages applicable, to evaluate design proposals • Safety, functionality and economic considerations are incorporated in the system design • Design complies with all requirements and includes specifications and documentation for installation of apparatus/equipment, accessories and wiring systems •Instructions for the use and operation of apparatus/system are documented where applicable
|
Element: |
3. Check and finalise design |
Performance Criteria: |
• Design is checked under established procedures for compliance with all relevant requirements • Design is submitted for appropriate organisational approval and, where applicable, statutory or regulatory approval • Approved copies of design documents are issued and copies retained in records in accordance with established procedures and requirements
|
Learning Outcomes
Details of Learning Activities
This is a Laboratory based course, where activities are Lab Exercises, Lab Tests and Simuled Microsoft Exam
Teaching Schedule
Week - Topic
19 Allocating IP Addressing by Using Dynamic Host Configuration Protocol / Managing and Monitoring Dynamic Host Configuration Protocol
20 Resolving Host Names by Using Domain Name System
21 Integrating Domain Name System and Active Directory Managing and Monitoring Domain Name System
22 Resolving NetBIOS Names by Using Windows Internet Name Service
23 Configuring Routing by Using Routing and Remote Access
24 Securing Network Traffic by Using IPSec
25 Configuring Network Access
26 Managing and Monitoring Network Access
26 Prac Test and Exam 70-291
27 Installing and Configuring Exchange Server 2007 / Configure Exchange Server Roles
28 Configuring Recipients and Public Folders / Implement Bulk management of mail-enabled objects
29 Configuring the Exchange Infrastructure / Connectors
30 Transport Rules / Antivirus and Anti-spam
31 Policies / Public Folders
32 Client Connectivity / Monitoring and Reporting
33 Disaster Recovery / Troubleshooting - Client Performance
34 Troubleshooting - Access to Resources and Messages / Mail Flow
35 Troubleshooting - Mailbox Servers, External and Additional Services, Identifying Trends
36 Prac Test and Exam 70-236
Learning Resources
Prescribed Texts
References
Other Resources
Overview of Assessment
Laboratory assessment
Laboratory Tasks
Simulated Microsoft Exam
Assessment Tasks
Laboratory Exercises
Laboratory Tests
Simulated Microsoft Eaxm
Assessment Matrix
Course Overview: Access Course Overview