To provide the learner with the underpinning skills and knowledge requiured for an employee working within the Computer Systems Industry . This unit estasblishes a foundation on which later study will build.
National Element Code & Title: |
UTENES008A Provide technical leadership in the workplace |
Element: |
Demonstrate standards of performance |
Performance Criteria: |
Work demonstrated follows OH&S policies and procedures with the work is appropriately sequenced in accordance with requirements
Work demonstrated is coordinated effectively with others involved on the work site
Work demonstrated meets requirements
Unplanned events or conditions are responded to in accordance with established procedures |
Element: |
Maintain personal competence |
Performance Criteria: |
Personal competence is assessed against requirements to determine personal training needs
Feedback on competence is used to develop personal training needs in accordance with established procedures
Participation in technical programs to enhance competence are undertaken in accordance with established procedures |
Element: |
Organise personal work priorities |
Performance Criteria: |
Work priorities are organised in accordance with established procedures
Work is managed effectively to accomplish requirements
Technology is used to improve efficiency in the management of information in accordance with established procedures
Personal training within the workplace is managed in accordance with established procedures |
National Element Code & Title: |
UTENES304AA Undertake commissioning of advanced systems & apparatus (Computer systems) |
Element: |
Inspect and notify completion of work |
Performance Criteria: |
Final inspections and performance checks are undertaken to ensure that the commissioning procedures of advanced system and associated apparatus conforms to requirements
Commissioning results and work completion are notified in accordance with established procedures |
Element: |
Plan and prepare to undertake commissioning procedures |
Performance Criteria: |
Commissioning procedures are planned and prepared to ensure OH&S policies and procedures are followed, the work is appropriately sequenced in accordance with requirements
Appropriate personnel are consulted to ensure the work is coordinated effectively with others involved on the work site
Systems' commissioning procedures are checked against requirements
Materials necessary to complete the work are obtained in accordance with established procedures and checked against requirements
Tools, equipment and testing devices needed to carry out the commissioning work are obtained in accordance with established procedures and checked for correct operation and safety
Preparatory work is checked to ensure no unnecessary damage has occurred and complies with requirements |
Element: |
Undertake commissioning procedures of, advance systems and associated apparatus |
Performance Criteria: |
OH&S policies and procedures are followed
Systems are checked as being isolated where necessary using specified testing procedures
Unplanned events or conditions are responded to in accordance with established procedures
Systems' commissioning procedures are performed in accordance with requirements, without damage or distortion to the surrounding environment or services
Contingency measures are managed and implemented in accordance with established procedures to ensure the system operates as intended or designed
On-going checks of the quality of the work are undertaken in accordance with established procedures |
National Element Code & Title: |
UTENES406AA Develop complex testing & evaluation procedures (Computer systems) |
Element: |
. Develop complex testing and evaluation procedures |
Performance Criteria: |
OH&S policies and procedures are followed are detailed
Normal function of advanced systems and associated apparatus is ascertained and detailed in accordance with requirements
Systems and associated apparatus isolation and specified testing procedures are detailed where necessary
Systems and associated apparatus complex testing is detailed in accordance with requirements
Response to unplanned events or conditions in accordance with established procedures are detailed
Approval to implement contingencies in accordance with established procedures from appropriate personnel are detailed
On-going checks of the quality of the work in accordance with established procedures are detailed
Final complex testing and evaluation procedures of systems and associated apparatus conforming to requirements are detailed
Notification of work completion in accordance with established procedures is detailed |
Element: |
Completion of work |
Performance Criteria: |
Final testing and evaluation procedures are undertaken in accordance with established procedures
Complex testing and evaluation procedures completion is notified in accordance with established procedures |
Element: |
Plan and prepare for the development of complex testing and evaluation procedures |
Performance Criteria: |
Identified OH&S policies and procedures to be followed are planned and prepared, and the work sequence in accordance with requirements
Appropriate personnel are consulted to ensure the programs for maintenance are coordinated effectively with others involved on the work site
Programs to be developed for complex testing and evaluation are checked against job requirements
Materials necessary to complete the work areidentified and detailed in accordance with established procedures and checked against job requirements
Tools, equipment and testing devices needed to carry out the work are identified and detailed in accordance with established procedures
Preparatory work is identified to ensure compliance with requirements |
National Element Code & Title: |
UTENES504AA Diagnose & rectify faults in advanced systems & apparatus (Computer systems) |
Element: |
Diagnose faults in advanced systems and associated apparatus |
Performance Criteria: |
OH&S policies and procedures are followed
Reported fault(s) are confirmed and the normal function of systems and associated apparatus is ascertained in accordance with requirements
Systems are checked as being isolated where necessary using specified testing procedures
Systems and associated apparatus faults are diagnosed in accordance with requirements, without damage or distortion to the surrounding environment or services
Contingency measures are managed and implemented in accordance with established procedures to ensure the system operates as intended or designed
Where applicable, appropriate personnel and resources are determined and coordinated to effect rectification of fault(s)
Unplanned events or conditions are responded to in accordance with established procedures
On-going checks of the quality of work are undertaken in accordance with established procedures |
Element: |
Plan and prepare for diagnosis of faults in advanced systems and associated apparatus |
Performance Criteria: |
Diagnosis of faults is planned and prepared to ensure OH&S policies and procedures are followed and the work is appropriately sequenced in accordance with requirements
Appropriate personnel are consulted to ensure the work is coordinated effectively with others involved on the work site
Systems and apparatus faults are checked against job requirements
Materials necessary to complete the work are obtained in accordance with established procedures and checked against job requirements
Tools, equipment and testing devices needed to carry out the work are obtained in accordance with established procedures and checked for correct operation and safety
Preparatory work is checked to ensure no unnecessary damage has occurred and complies with requirements |
Element: |
Provide status report(s) |
Performance Criteria: |
Arrangements are made for maintenance and/or repair(s), where necessary, with relevant authorised personnel in accordance with requirements
Status report(s) are completed and notified in accordance with established procedures |
Element: |
Rectify faults in advanced systems and associated apparatus |
Performance Criteria: |
OH&S policies and procedures are followed.
Systems and associated apparatus are isolated, where necessary, in accordance with established procedures
Adjustments are made in accordance with established procedures where necessary, to return systems and associated apparatus to normal operating parameters
Faulty component(s) are rectified or replaced, without damage or distortion to the surrounding environment or services
Unplanned events or conditions are responded to in accordance with established procedures
Approval is obtained in accordance with established procedures from appropriate personnel before any contingencies are implemented
On-going checks of the quality of work are undertaken in accordance with established procedures
Systems and associated apparatus are tested to ensure safety of the installation
Systems and associated apparatus are returnedto service in accordance with established procedure |
National Element Code & Title: |
UTENES702AA Design electrical/electronic apparatus & systems (Computer systems) |
Element: |
Check and finalise design |
Performance Criteria: |
Design is checked under established procedures for compliance with all relevant requirements
Design is submitted for appropriate organisational approval and, where applicable, statutory or regulatory approval
Approved copies of design documents are issued and copies retained in records in accordance with established procedures and requirements |
Element: |
Design system and installation |
Performance Criteria: |
Alternative designs are considered and discussed with appropriate personnel
Circuit/system modelling is used in common stages applicable, to evaluate design proposals
Safety, functionality and economic considerations are incorporated in the system design
Design complies with all requirements and includes specifications and documentation for installation of apparatus/equipment, accessories and wiring systems
Instructions for the use and operation of apparatus/system are documented where applicable |
Element: |
Establish design brief |
Performance Criteria: |
OH&S requirements and environmental issues that may influence the design are determined
Design concept and details are discussed with appropriate personnel in order to establish a detailed design brief
Design parameters are established from organisational policies and specifications for electrical systems and other requirements that may influence the design |