Course Title: Frame and fit wet area fixtures

Part A: Course Overview

Program: C3320 Certificate III in Carpentry

Course Title: Frame and fit wet area fixtures

Portfolio: Vocational Education

Nominal Hours: 24

Regardless of the mode of delivery, represent a guide to the relative teaching time and student effort required to successfully achieve a particular competency/module. This may include not only scheduled classes or workplace visits but also the amount of effort required to undertake, evaluate and complete all assessment requirements, including any non-classroom activities.

Important Information:

Nil



Course Contact: Program Manager

Course Contact Phone: +61 3 9925 4468

Course Contact Email: vehs@rmit.edu.au



Course Description

This unit of competency specifies the outcomes required to install supporting framework for fixtures and flashings associated with the wet area construction for a bath, shower base and sink or basin unit, and preparation for wet area linings. It includes bathroom, laundry, shower, toilet and en suite wet areas.

Pre-requisite Courses and Assumed Knowledge and Capabilities

CPCCOHS2001A Apply OHS requirements, policies and procedures in the construction industry



National Competency Codes and Titles

National Element Code & Title:

CPCCCA3012A Frame and fit wet area fixtures

Elements:

1. Plan and prepare.

2. Set out wet area installation.

3. Prepare for bath installation.

4. Prepare for shower base installation.

5. Prepare for sink installation.

6. Clean up.


Learning Outcomes

Element

Chapter reference

Content reference

Relevant worksheets and questions (by chapter)

 

 

 


 

 

 


1. Plan and prepare.

 


 


Chapter 8: Install wet area fixtures

What is a wet area?

Planning and preparation

Student activity 8.1 – Reading plans
Worksheet 1 – Q1–2
Worksheet 2 – Q1–5
Student activity 8.4 – Bathroom design

 

 

 


2. Set out wet area installation

Chapter 8: Install wet area fixtures

Wet area construction

Student activity 8.2 – Concrete in residential construction

Worksheet 3 – Q1–7

3. Prepare for bath installation.

Chapter 8: Install wet area fixtures

Baths and spas


4. Prepare for shower base installation.

Chapter 8: Install wet area fixtures

Showers

Student activity 8.3 – Testing fixing methods and wet area lining systems

5. Prepare for sink installation.

Chapter 8: Install wet area fixtures

Linings (under sub-heading ‘vanities and tubs’)

Worksheet 4 – Q1–14

6. Clean up.

Chapter 8: Install wet area fixtures





Overview of Assessment

This unit of competency specifies the outcomes required to read and interpret plans and specifications relevant to construction operations. It includes the identification of types of plans and drawings and their functions, the recognition of commonly used symbols and abbreviations, the identification of key features and specifications on a site plan, the comprehension of written job specifications and the recognition of document status and amendment detail.