Course Title: Develop and carry out a cyber security industry project

Part B: Course Detail

Teaching Period: Term2 2025

Course Code: INTE5061

Course Title: Develop and carry out a cyber security industry project

School: 520T Future Technologies

Campus: City Campus

Program: C4424 - Certificate IV in Cyber Security

Course Contact: Michael Barton

Course Contact Phone: +61 3 9925 1409

Course Contact Email: michael.barton2@rmit.edu.au


Name and Contact Details of All Other Relevant Staff

Nominal Hours: 100

Regardless of the mode of delivery, represent a guide to the relative teaching time and student effort required to successfully achieve a particular competency/module. This may include not only scheduled classes or workplace visits but also the amount of effort required to undertake, evaluate and complete all assessment requirements, including any non-classroom activities.

Pre-requisites and Co-requisites

VU23213 - Utilise basic network concepts and protocols required in cyber security
VU23215 - Test concepts and procedures for cyber security

Course Description

In this course you will gain the skills and knowledge to develop and undertake a project that simulates a real cyber security industry environment


National Codes, Titles, Elements and Performance Criteria

National Element Code & Title:

VU23220 Develop and carry out a cyber security industry project

Element:

1 Establish project team

Performance Criteria:

1.1 Team members for the project are selected

1.2 Individual responsibilities for each team member are determined

1.3 Team performance criteria are established

1.4 Methodology of team performance measurement is defined

Element:

2 Determine context of business need or problem (project)

Performance Criteria:

2.1 Scope and system boundaries of the business problem are determined together with the problem solving methodology

2.2 Background information is gathered and development of questions appropriate to the business problem are prepared 2.3 Objectives and expected outcomes to be achieved are identified and documented

2.4 Key elements for project milestones are identified2.5 Work plan statement is developed

Element:

3 Support the project plan development

Performance Criteria:

3.1 Process of identifying tasks and resources needed to complete the project plan is determined

3.2 Schedule of project tasks including realistic timeframes and costs is prepared

3.3 Specific responsibilities to project team members are allocated

3.4 Process to manage risks and/or unexpected events that may impact upon the project objectives and/or timelines is developed

Element:

4 Evaluate the suitability of the gathered resources

Performance Criteria:

4.1 Key components required from the project are identified

4.2 Resources for the project are allocated

4.3 Function and operation of selected resources allocated to team members are defined

Element:

5 Implement the project design

Performance Criteria:

5.1 Suitable systematic processes to implement the project are selected

5.2 Subtasks for the overall project are defined and allocated to team members

5.3 Subtasks are developed

5.4 A systematic testing procedure is defined

5.5 As part of the project Red and Blue teaming exercises are planned and executed

5.6 Verification of the functionality of the project in either part or full is performed

5.7 Documentation for the process such as meeting minutes, reports, emails is generated

Element:

6 Support project completion and handover

Performance Criteria:

6.1 An implementation plan with minimal end user's disruption is developed

6.2 Technical documentation including project timeframes, scope, cost is drafted

6.3 Technical documentation for approval by appropriate person/s is submitted

6.4 Developed project risk strategy is evaluated

6.5 Where required appropriate plan to train end users is presented

6.6 Final project sign-off from sponsor and key stakeholders is obtained

6.7 Project is closed and experience gained and lessons learnt are discussed and documented


Learning Outcomes


On successful completion of this course you will have developed and applied the skills and knowledge required to demonstrate competency in the above elements.


Details of Learning Activities

VU23220 - Develop a cyber security industry project.

VU23221 - Evaluate and test an incident response plan for an enterprise

By the end of this course, you will be able to:

  • develop a network security infrastructure (project) and
  • prepare a implementation plan that leads to a solution
  • organize a work team
  • function and solve problems in a work team environment
  • gather resources for project implementation
  • test resources for functionality and operation as required
  • implement project according to the provided design
  • test the system for functionality
  • conduct team activities and evaluate team performance
  • prepare project documentation and make a presentation to the
    client


Teaching Schedule

Week

Date

Topic

Assessment / Learning activities

Week 1

14-18 July 2025

Introduction to Installing virtual Machines

Learn why networks and data are attacked.

Learn how to prepare for a career in cybersecurity operations

Week 2

21-25 July 2025

Introduction to Security Testing

Introduction to Security Testing

Week 3

28 July - 1 August 2025

Introduction to Network Scanning

Research Assignment

Introduction to Network Scanning

Research assignment due week 10

Week 4

4-8 August 2025

Introduction to Network Reconnaissance

Introduction to Network Reconnaissance

Week 5

11-15 August 2025

Introduction to Virtulisation

Introduction to Virtulisation

Week 6

18-22 August 2025

Introduction to Wireless Security

Introduction to Wireless Security

Week 7

25-29 August 2025

Introduction to IPS,IDS and Firewalls

Introduction to IPS,IDS and Firewalls

1-5 September 2025

Mid-semester break

Mid-semester break

Week 8

8-12 September 2025

Introduction to Understanding Defence

Introduction to Understanding Defence

Start groups and Final Assignment

Week 9

15-19 September 2025

Introduction Team Developement and Final lab Setup

Introduction Team Developement and Final lab Setup

Week 10

22-26 September 2025

Introduction to Tender Response Fundamentals and Final lab Setup

Introduction to Tender Response Fundamentals and Final lab Setup

Week 11

29 September - 3 October 2025

Introduction to Assessment Day 1 and SOC Models

Introduction to Assessment Day 1 and SOC Models

Final assignment

Week 12

6-10 October 2025

Introduction to Assessment Day 2 and Network Design

Introduction to Assessment Day 2 and Network Design

Final assignment

Week 13

11-19 October

Introduction to Assessment Day 3 and Incident Response

Introduction to Assessment Day 3 and Incident Response

Final assignment

Week 14

20-24 October 2025

Introduction to Assessment Day 4 and Red Blue Teams

Introduction to Assessment Day 4 and Red Blue Teams

Final assignment

Week 15

27-31 October 2025

Introduction to Assessment Day 5 Threat Intelligence

Introduction to Assessment Day 5 Threat Intelligence

Final assignment

Week 16

3-7 November 2025

Assessment Catchup

Week 17

10-14 November 2025

Assessment Catchup


Learning Resources

Prescribed Texts


References


Other Resources

A computer with at least 16 gig of ram and an i5 processor or equivalent.


Overview of Assessment

Assessment for this course is ongoing throughout the semester. Your knowledge and understanding of course content is assessed through participation in class exercises, oral/written presentations and through the application of learned skills and insights. Full assessment briefs will be provided and can be found on CANVAS.


Assessment Tasks

Assessment Tasks

1 knowledge assessment

2 practical team assessments


Assessment Matrix

Element

Performance criteria

Assessment Task 1 AT1

Assessment

Task 2: Industry Project Documentation

Assessment

Task 3: Industry Project Practical Observations

1 Establish project team

1.1 Team members for the project are selected

1a

1.2 Individual responsibilities for each team member are determined

Q7, Q9

1a

1,2

1.3 Team performance criteria are established

Q10

1b

1,2

1.4 Methodology of team performance measurement is defined

Q10

1b

2 Determine context of business need or problem (project)

2.1 Scope and system boundaries of the business problem are determined together with the problem-solving methodology

2b

2.2 Background information is gathered and development of questions appropriate to the business problem are prepared

Q3

2a

3,4

2.3 Objectives and expected outcomes to be achieved are identified and documented

2b, 2c

2.4 Key elements for project milestones are identified

Q1, Q2, Q7, Q10, Q11

2c

1,2 3

2.5 Work plan statement is developed

Q1, Q2, Q7, Q10, Q11

Part 2c

3 Support the project plan development

3.1 Process of identifying tasks and resources needed to complete the project plan is determined

Q7

2c

1,2

3.2 Schedule of project tasks including realistic timeframes and costs is prepared

2c

3.3 Specific responsibilities to project team members are allocated

1a, 2c

3.4 Process to manage risks and/or unexpected events that may impact upon the project objectives and/or timelines is developed

2c

4 Evaluate the suitability of the gathered resources

4.1 Key components required from the project are identified

Q15

3a

4.2 Resources for the project are allocated

Q15

3b,3c

4.3 Function and operation of selected resources allocated to team members are defined

3b

5 Implement the project design

5.1 Suitable systematic processes to implement the project are selected

3c

5.2 Subtasks for the overall project are defined and allocated to team members

1a,b

1

5.3 Subtasks are developed

4

5.4 A systematic testing procedure is defined

4

5.5 As part of the project red and blue teaming exercises are planned and executed

2a

4

5.6 Verification of the functionality of the project in either part or full is performed

4

5.7 Documentation for the process such as meeting minutes, reports, emails is generated

5

6 Support project completion and handover

6.1 An implementation plan with minimal end user’s disruption is developed

3, 4

6.2 Technical documentation including project timeframes, scope, cost is drafted

7c

6.3 Technical documentation for approval by appropriate person/s is submitted

6

6.4 Developed project risk strategy is evaluated

Q11

7d

6.5 Where required appropriate plan to train end users is presented

Q12

7,8

6.6 Final project sign-off from sponsor and key stakeholders is obtained

7a – 7d

6.7 Project is closed, and experience gained, and lessons learnt are discussed and documented

7a -7d

Other Information

Knowledge of virtual machines

Course Overview: Access Course Overview