Course Title: Internetworking and Middleware 4
Part A: Course Overview
Program:
C6042
Course Title:
Internetworking and Middleware 4
Portfolio:
SET
Nominal Hours:
157.0
Regardless of the mode of delivery, represent a guide to the
relative teaching time and student effort required to
successfully achieve a particular competency/module. This may
include not only scheduled classes or workplace visits but also
the amount of effort required to undertake, evaluate and
complete all assessment requirements, including any
non-classroom activities.
Course Code |
Campus |
Career |
School |
Learning Mode |
Teaching Period(s) |
EEET5827L |
City Campus |
TAFE |
130T Engineering (TAFE) |
Face-to-Face |
Term2 2009
|
Course Contact:
Mohammad Hassan
Course Contact Phone:
+61 3 99254700
Course Contact Email:
mohammad.hassan@rmit.edu.au
Course Description
This course includes the CICSO CCNA4 program
Pre-requisite Courses and Assumed Knowledge and Capabilities
CICSO CCNA 1-3
National Competency Codes and Titles
National Element Code & Title: |
UTENES008A Provide technical leadership in the workplace |
Elements: |
UTENES008A/01 Demonstrate standards of performance • Work demonstrated follows OH&S policies and procedures with the work is appropriately sequenced in accordance with requirements • Work demonstrated is coordinated effectively with others involved on the work site • Work demonstrated meets requirements • Unplanned events or conditions are responded to in accordance with established procedures UTENES008A/02 Maintain personal competence • Personal competence is assessed against requirements to determine personal training needs • Feedback on competence is used to develop personal training needs in accordance with established procedures • Participation in technical programs to enhance competence are undertaken in accordance with established procedures UTENES008A/03 Organise personal work priorities • Work priorities are organised in accordance with established procedures • Work is managed effectively to accomplish requirements • Technology is used to improve efficiency in the management of information in accordance with established procedures • Personal training within the workplace is managed in accordance with established procedures
|
National Element Code & Title: |
UTENES304AA Undertake commissioning of advanced systems & apparatus (Computer systems) |
Elements: |
UTENES304AA/01 Plan and prepare to undertake commissioning procedures •Commissioning procedures are planned and prepared to ensure OH&S policies and procedures are followed, the work is appropriately sequenced in accordance with requirements •Appropriate personnel are consulted to ensure the work is coordinated effectively with others involved on the work site •Systems' commissioning procedures are checked against requirements •Materials necessary to complete the work are obtained in accordance with established procedures and checked against requirements •Tools, equipment and testing devices needed to carry out the commissioning work are obtained in accordance with established procedures and checked for correct operation and safety •Preparatory work is checked to ensure no unnecessary damage has occurred and complies with requirements UTENES304AA/02 Undertake commissioning procedures of, advance systems and associated apparatus • OH&S policies and procedures are followed • Systems are checked as being isolated where necessary using specified testing procedures •Unplanned events or conditions are responded to in accordance with established procedures •Systems' commissioning procedures are performed in accordance with requirements, without damage or distortion to the surrounding environment or services •Contingency measures are managed and implemented in accordance with established procedures to ensure the system operates as intended or designed •On-going checks of the quality of the work are undertaken in accordance with established procedures UTENES304AA/03 Inspect and notify completion of work •Final inspections and performance checks are undertaken to ensure that the commissioning procedures of advanced system and associated apparatus conforms to requirements •Commissioning results and work completion are notified in accordance with established procedures
|
National Element Code & Title: |
UTENES406AA Develop complex testing & evaluation procedures (Computer systems) |
Elements: |
UTENES406AA/01 Plan and prepare for the development of complex testing and evaluation procedures •Identified OH&S policies and procedures to be followed are planned and prepared, and the work sequence in accordance with requirements •Appropriate personnel are consulted to ensure the programs for maintenance are coordinated effectively with others involved on the work site •Programs to be developed for complex testing and evaluation are checked against job requirements •Materials necessary to complete the work are identified and detailed in accordance with established procedures and checked against job requirements •Tools, equipment and testing devices needed to carry out the work are identified and detailed in accordance with established procedures •Preparatory work is identified to ensure compliance with requirements UTENES406AA/02 Develop complex testing and evaluation procedures •OH&S policies and procedures are followed are detailed •Normal function of advanced systems and associated apparatus is ascertained and detailed in accordance with requirements •Systems and associated apparatus isolation and specified testing procedures are detailed where necessary •Systems and associated apparatus complex testing is detailed in accordance with requirements •Response to unplanned events or conditions in accordance with established procedures are detailed •Approval to implement contingencies in accordance with established procedures from appropriate personnel are detailed •On-going checks of the quality of the work in accordance with established procedures are detailed •Final complex testing and evaluation procedures of systems and associated apparatus conforming to requirements are detailed •Notification of work completion in accordance with established procedures is detailed UTENES406AA/03 Completion of work •Final testing and evaluation procedures are undertaken in accordance with established procedures • Complex testing and evaluation procedures completion is notified in accordance with established procedures
|
National Element Code & Title: |
UTENES504AA Diagnose & rectify faults in advanced systems & apparatus (Computer systems) |
Elements: |
UTENES504AA/01 Plan and prepare for diagnosis of faults in advanced systems and associated apparatus • Diagnosis of faults is planned and prepared to ensure OH&S policies and procedures are followed and the work is appropriately sequenced in accordance with requirements • Appropriate personnel are consulted to ensure the work is coordinated effectively with others involved on the work site • Systems and apparatus faults are checked against job requirements • Materials necessary to complete the work are obtained in accordance with established procedures and checked against job requirements •Tools, equipment and testing devices needed to carry out the work are obtained in accordance with established procedures and checked for correct operation and safety •Preparatory work is checked to ensure no unnecessary damage has occurred and complies with requirements UTENES504AA/02 Diagnose faults in advanced systems and associated apparatus •OH&S policies and procedures are followed • Reported fault(s) are confirmed and the normal function of systems and associated apparatus is ascertained in accordance with requirements • Systems are checked as being isolated where necessary using specified testing procedures • Systems and associated apparatus faults are diagnosed in accordance with requirements, without damage or distortion to the surrounding environment or services • Contingency measures are managed and implemented in accordance with established procedures to ensure the system operates as intended or designed • Where applicable, appropriate personnel and resources are determined and coordinated to effect rectification of fault(s) • Unplanned events or conditions are responded to in accordance with established procedures • On-going checks of the quality of work are undertaken in accordance with established procedures UTENES504AA/03 Rectify faults in advanced systems and associated apparatus • OH&S policies and procedures are followed. • Systems and associated apparatus are isolated, where necessary, in accordance with established procedures • Adjustments are made in accordance with established procedures where necessary, to return systems and associated apparatus to normal operating parameters • Faulty component(s) are rectified or replaced, without damage or distortion to the surrounding environment or services • Unplanned events or conditions are responded to in accordance with established procedures • Approval is obtained in accordance with established procedures from appropriate personnel before any contingencies are implemented • On-going checks of the quality of work are undertaken in accordance with established procedures • Systems and associated apparatus are tested to ensure safety of the installation • Systems and associated apparatus are returned to service in accordance with established procedures UTENES504AA/04 Provide status report(s) • Arrangements are made for maintenance and/or repair(s), where necessary, with relevant authorised personnel in accordance with requirements • Status report(s) are completed and notified in accordance with established procedures
|
National Element Code & Title: |
UTENES702AA Design electrical/electronic apparatus & systems (Computer systems) |
Elements: |
UTENES702AA/01 Establish design brief • OH&S requirements and environmental issues that may influence the design are determined • Design concept and details are discussed with appropriate personnel in order to establish a detailed design brief • Design parameters are established from organisational policies and specifications for electrical systems and other requirements that may influence the design UTENES702AA/02 Design system and installation • Alternative designs are considered and discussed with appropriate personnel • Circuit/system modelling is used in common stages applicable, to evaluate design proposals • Safety, functionality and economic considerations are incorporated in the system design • Design complies with all requirements and includes specifications and documentation for installation of apparatus/equipment, accessories and wiring systems •Instructions for the use and operation of apparatus/system are documented where applicable UTENES702AA/03 Check and finalise design • Design is checked under established procedures for compliance with all relevant requirements • Design is submitted for appropriate organisational approval and, where applicable, statutory or regulatory approval • Approved copies of design documents are issued and copies retained in records in accordance with established procedures and requirements
|
Learning Outcomes
Students are expected to
• meet only basic performance requirements of the competency (and its elements) at this level.
• demonstrate Key Competencies within the practical activities and work performance simulations of designing, implementing and managing Local Area Network (LAN)
• differentiate between the following WAN services; HDLC, PPP, Frame Relay
• list commands to monitor Frame Relay operation in the router
• work on DHCP, NAT/PAT, ISDN Technologies, Port Forwarding, IP V6
• List WAN Implementation issues, Enterprise network troubleshooting.
• Administer network.
Overview of Assessment
Lab journal 10 %
1st lab Exam Lab 20 %
Final lab Exam Lab 25 %
Final exam Written 30 %
Case Study 15 %