Course Title: Final Assessment Unit
Part B: Course Detail
Teaching Period:
Term2 2009
Course Code:
EEET5835L
Course Title:
Final Assessment Unit
School: 130T
Engineering (TAFE)
Campus:
City Campus
Program:
C6042 - Advanced Diploma of Computer Systems Engineering
Course
Contact
:
Eddie Vanda
Course
Contact
Phone:
+61 3 9925 4456
Course
Contact
Email:eddie.vanda@rmit.edu.au
Name and Contact Details of All Other Relevant Staff
Eddie Vanda
Sukhvir Judge
Nominal Hours:
5
Regardless of the mode of delivery, represent a guide to the
relative teaching time and student effort required to
successfully achieve a particular competency/module. This may
include not only scheduled classes or workplace visits but also
the amount of effort required to undertake, evaluate and
complete all assessment requirements, including any
non-classroom activities.
Pre-requisites and Co-requisites
No pre-requisites
Course Description
This course prepares the student to undertake the final activities in their program.
National Codes, Titles, Elements and Performance Criteria
National Element Code & Title: |
UTENES008A Provide technical leadership in the workplace |
Element: |
Work demonstrated follows OH&S policies and procedures with the work is appropriately sequenced in accordance with requirements
Work demonstrated is coordinated effectively with others involved on the work site
Work demonstrated meets requirements
Unplanned events or conditions are responded to in accordance with established procedures |
Performance Criteria: |
#
Personal competence is assessed against requirements to determine personal training needs #
Feedback on competence is used to develop personal training needs in accordance with established procedures #
Participation in technical programs to enhance competence are undertaken in accordance with established procedures |
National Element Code & Title: |
UTENES304AA Undertake commissioning of advanced systems & apparatus (Computer systems) |
Element: |
Commissioning procedures are planned and prepared to ensure OH&S policies and procedures are followed, the work is appropriately sequenced in accordance with requirements
Appropriate personnel are consulted to ensure the work is coordinated effectively with others involved on the work site
Systems' commissioning procedures are checked against requirements
Materials necessary to complete the work are obtained in accordance with established procedures and checked against requirements
Tools, equipment and testing devices needed to carry out the commissioning work are obtained in accordance with established procedures and checked for correct operation and safety
Preparatory work is checked to ensure no unnecessary damage has occurred and complies with requirements |
Performance Criteria: |
#
OH&S policies and procedures are followed #
Systems are checked as being isolated where necessary using specified testing procedures #
Unplanned events or conditions are responded to in accordance with established procedures #
Systems' commissioning procedures are performed in accordance with requirements, without damage or distortion to the surrounding environment or services #
Contingency measures are managed and implemented in accordance with established procedures to ensure the system operates as intended or designed #
On-going checks of the quality of the work are undertaken in accordance with established procedures |
National Element Code & Title: |
UTENES406AA Develop complex testing & evaluation procedures (Computer systems) |
Element: |
Identified OH&S policies and procedures to be followed are planned and prepared, and the work sequence in accordance with requirements
Appropriate personnel are consulted to ensure the programs for maintenance are coordinated effectively with others involved on the work site
Programs to be developed for complex testing and evaluation are checked against job requirements
Materials necessary to complete the work areidentified and detailed in accordance with established procedures and checked against job requirements
Tools, equipment and testing devices needed to carry out the work are identified and detailed in accordance with established procedures
Preparatory work is identified to ensure compliance with requirements |
Performance Criteria: |
#
OH&S policies and procedures are followed are detailed #
Normal function of advanced systems and associated apparatus is ascertained and detailed in accordance with requirements #
Systems and associated apparatus isolation and specified testing procedures are detailed where necessary #
Systems and associated apparatus complex testing is detailed in accordance with requirements #
Response to unplanned events or conditions in accordance with established procedures are detailed #
Approval to implement contingencies in accordance with established procedures from appropriate personnel are detailed #
On-going checks of the quality of the work in accordance with established procedures are detailed #
Final complex testing and evaluation procedures of systems and associated apparatus conforming to requirements are detailed #
Notification of work completion in accordance with established procedures is detailed |
National Element Code & Title: |
UTENES504AA Diagnose & rectify faults in advanced systems & apparatus (Computer systems) |
Element: |
Diagnosis of faults is planned and prepared to ensure OH&S policies and procedures are followed and the work is appropriately sequenced in accordance with requirements
Appropriate personnel are consulted to ensure the work is coordinated effectively with others involved on the work site
Systems and apparatus faults are checked against job requirements
Materials necessary to complete the work are obtained in accordance with established procedures and checked against job requirements
Tools, equipment and testing devices needed to carry out the work are obtained in accordance with established procedures and checked for correct operation and safety
Preparatory work is checked to ensure no unnecessary damage has occurred and complies with requirements |
Performance Criteria: |
#
OH&S policies and procedures are followed #
Reported fault(s) are confirmed and the normal function of systems and associated apparatus is ascertained in accordance with requirements #
Systems are checked as being isolated where necessary using specified testing procedures #
Systems and associated apparatus faults are diagnosed in accordance with requirements, without damage or distortion to the surrounding environment or services #
Contingency measures are managed and implemented in accordance with established procedures to ensure the system operates as intended or designed #
Where applicable, appropriate personnel and resources are determined and coordinated to effect rectification of fault(s) #
Unplanned events or conditions are responded to in accordance with established procedures #
On-going checks of the quality of work are undertaken in accordance with established procedures |
National Element Code & Title: |
UTENES702AA Design electrical/electronic apparatus & systems (Computer systems) |
Element: |
OH&S requirements and environmental issues that may influence the design are determined
Design concept and details are discussed with appropriate personnel in order to establish a detailed design brief
Design parameters are established from organisational policies and specifications for electrical systems and other requirements that may influence the design |
Performance Criteria: |
#
Alternative designs are considered and discussed with appropriate personnel #
Circuit/system modelling is used in common stages applicable, to evaluate design proposals #
Safety, functionality and economic considerations are incorporated in the system design #
Design complies with all requirements and includes specifications and documentation for installation of apparatus/equipment, accessories and wiring systems #
Instructions for the use and operation of apparatus/system are documented where applicable |
Learning Outcomes
Details of Learning Activities
Students participate in discussions about the final process about finishing their program.
Teaching Schedule
This course introduces and finished the final semester of the vocational program.
Learning Resources
Prescribed Texts
References
Other Resources
Overview of Assessment
Students need to finish all their other courses in order to pass this assessment.
Assessment Tasks
The satisfactory completion of all units in the program.
Assessment Matrix
The satisfactory completion of all units in the program.
Course Overview: Access Course Overview